Much of Riverdale and Kingsbridge lives in co-ops. Renovating one means satisfying two sets of rules: your building’s (the alteration agreement) and the city’s (permits, asbestos, lead, noise, and in some streets landmarks). Miss either and the job stalls. This checklist puts them in the order you’ll meet them.
Every building is different, so get your building’s alteration agreement from the managing agent first. The city rules below come from DOB, DEP, HPD, LPC and DCWP pages, checked in October and November 2026.
The checklist at a glance
- Get your building’s alteration agreement and rules from the managing agent.
- Decide the scope: cosmetic, or work that needs a DOB permit.
- Hire licensed people: a home improvement contractor, plus a licensed plumber or electrician for that work.
- Collect insurance certificates in the exact wording your building requires.
- If the work needs a permit: architect or engineer, asbestos check, and board authorization in DOB NOW.
- Check lead-paint rules if the building is older and you rent the apartment out.
- In a historic district, check whether LPC needs to sign off.
- Sign a written contract with the right to cancel and a permit notice.
- Work only during allowed hours, and close out permits and the board’s sign-off at the end.
Just bought? From closing to your first contractor
If you have just bought a co-op or condo in Riverdale, this is the order that avoids redoing work:
- Get the alteration agreement. Ask the managing agent for it and for the building’s renovation rules. If you haven’t closed yet, ask during your due diligence, so you know what the building allows before you commit.
- Look up the building’s record. DOB’s building history tools (BIS and the DOB NOW Public Portal) show the permits, violations and complaints filed for the building. Each is marked active or resolved.
- Find out when the building went up. Buildings from before April 1, 1987 need an asbestos check before permit work (step 6). The city’s lead law covers buildings from before 1960 (step 7). The managing agent will know the year.
- Decide the scope. Cosmetic work or permit work (step 2). Permit work needs an architect or engineer before contractors can bid on the same plans.
- Get quotes from licensed contractors who have read your building’s rules (steps 3 and 4).
- Submit the board’s alteration package. Then wait for two separate sign-offs: the board’s approval and, for permit jobs, the board’s authorization in DOB NOW (step 5). Ask the managing agent how long reviews usually take, and plan your move-in around it.
1. Start with the alteration agreement
The alteration agreement is a contract between you and the co-op. It sets what you may do, who may do it, when, and who pays if something goes wrong. No city law sets its terms; they come from your proprietary lease and the building’s rules. Ask the managing agent for:
- The agreement itself, plus any building rules for renovations (work hours, elevator use, debris, hallway protection).
- What the board needs to review: usually a written scope of work, and drawings for anything beyond cosmetic work.
- Fees and deposits the building charges, and how long board review usually takes.
- The exact names to list on insurance certificates.
Read it before you collect quotes, so every contractor bids on the same rules.
2. Work out whether you need a DOB permit
The Department of Buildings’ guide to kitchens and bathrooms and its do I need a permit page split the work roughly like this:
- No permit: painting, plastering, installing cabinets, resurfacing floors, and replacing a plumbing fixture in the same place (by a licensed plumber).
- Plumber’s own filing: a Licensed Master Plumber can file some plumbing repairs and replacements directly.
- Electrical permit: almost any electrical change, filed by a licensed electrician.
- Full permit (ALT2) with an architect or engineer: bigger kitchen and bathroom renovations, such as adding a bathroom, moving plumbing or gas lines beyond small limits, or moving a load-bearing wall.
Our kitchen and bathroom permit guides go into detail.
3. Hire licensed people
- The general contractor needs a Home Improvement Contractor license from DCWP. NYC311 notes that work in larger buildings is generally exempt, but the license is required when an owner or tenant hires the contractor for their own apartment, which is exactly the co-op shareholder’s case.
- Plumbing and gas must be done by a Licensed Master Plumber; electrical work by a licensed electrician. See who can legally do what.
- Check every license before you sign: how to check a contractor’s license.
4. Get the insurance certificates right
Your building will want certificates of insurance (COIs) from the contractor before work starts, usually naming the co-op and the managing agent. Get the exact wording from the managing agent and send it to the contractor’s insurance broker; a wrong name is one of the most common causes of delay.
Workers’ compensation is required for almost every New York employer. You can check a contractor’s coverage on the state’s employer coverage lookup. DCWP notes that ACORD forms are not acceptable proof of workers’ compensation, and the contractor’s contract must promise you a copy of the workers’ comp certificate before work starts.
5. Permit jobs: board authorization in DOB NOW
Since February 2, 2026, when a job is filed for a co-op apartment, the co-op board is a party to the DOB filing. According to DOB’s notice on co-op boards, a board representative has to confirm in DOB NOW that the board authorized the work. Build that step into your timeline: the board’s approval of your alteration package and its sign-off in DOB NOW are two separate things.
6. Asbestos check before permit work
For work that needs a DOB permit, DOB requires an asbestos investigation by a DEP-certified asbestos investigator first. If the work won’t disturb asbestos, the investigator files a report (often an ACP-5); if it will, the asbestos has to be handled as a DEP-regulated abatement project before the renovation goes ahead. Only buildings built after April 1, 1987 are exempt from this step, so ask your managing agent when your building went up.
7. Lead paint in older buildings
New York City’s lead law applies to buildings built before 1960 (and 1960 to 1978 if the owner knows there is lead paint). According to HPD, in co-ops it covers apartments not lived in by the shareholder or their family, so it matters most if you rent your apartment out. Where a child under 6 lives, disturbing more than 2 square feet of paint calls for HPD’s safe work practices. Separately, the EPA requires lead-safe certified firms for paid renovation work that disturbs paint in housing built before 1978. Ask your contractor for their EPA certification.
8. Historic districts: Fieldston and Riverdale
Parts of the neighborhood are in the Fieldston and Riverdale historic districts, regulated by the Landmarks Preservation Commission. LPC reviews most changes to the outside of a building, including windows. For interiors, LPC says a permit is needed only when the work needs a DOB permit, affects the exterior, or is in a landmarked interior. So a permitted kitchen or bathroom job in a landmarked building usually needs an LPC sign-off too, often a quick “certificate of no effect”. See LPC’s permits page and its expedited reviews.
9. Sign a proper contract
DCWP rules for home improvement contracts say:
- The contract must be written and signed by both of you, and show the contractor’s DCWP license number.
- It must include your right to cancel until midnight of the third business day, with a separate cancellation form. No work can start until those three days pass.
- Since June 2026, the contractor must give you a written permit notice before you sign: which permits the job needs, who will get them, estimated fees and how to check their status.
- DCWP advises paying no more than 25% up front.
10. During the work, and closing out
- Noise hours. The city allows construction from 7 a.m. to 6 p.m. on weekdays. Weekends and evenings need an after-hours permit, and your building’s rules are often stricter still.
- Keep the building informed. Follow the agreement’s rules on elevators, debris and protecting hallways.
- Close out. Make sure every permit is signed off with DOB, and get the building’s final sign-off so your deposit is returned.
Condo alteration agreements: what’s different
Renovating a condo in NYC follows almost the same steps as a co-op. The differences:
- The agreement: condos use alteration agreements too. Their terms come from the condo’s own declaration, bylaws and board rules, not a proprietary lease. No city law sets them, so ask the managing agent for the same documents listed in step 1.
- A standard form now exists: the New York City and New York State bar associations have approved a form of condominium alteration agreement, the first for condos (the co-op form dates from 2010). Many buildings still use their own, so ask which one yours uses.
- Board sign-off in DOB NOW: the February 2, 2026 rule covers condos as well. DOB’s notice makes the board a party to the filing when the owner type is “Condo Unit Owner”, and the board must confirm it authorized the work.
- Lead paint: HPD’s lead law covers condo units not lived in by the owner or their family, so it matters if you rent the unit out.
- The contractor’s license: the same as in a co-op. NYC311 says the DCWP license is required when an owner hires a contractor for their own apartment.
Everything else here (permits, asbestos, landmarks, the contract, noise hours) applies to condos unchanged.
For boards and managing agents: a checklist to hand residents
Boards are welcome to print or link this list. Before approving an alteration, ask the resident for:
- A written scope of work, and drawings by an architect or engineer for any work that needs a DOB permit.
- The contractor’s DCWP Home Improvement Contractor license number, and the license numbers of the plumber and electrician. Anyone can check them in a few minutes.
- Certificates of insurance naming the co-op and the managing agent exactly as your building requires.
- Proof of workers’ compensation on the state’s own forms. DCWP says ACORD forms are not acceptable proof; coverage can be checked on the state’s employer coverage lookup.
- For permit work: the asbestos investigator’s report, or the abatement filing if asbestos will be disturbed (step 6).
- For buildings from before 1978: the contractor’s EPA lead-safe firm certification (step 7).
- In the Riverdale or Fieldston Historic District, for work that needs a DOB permit: the LPC sign-off (step 8).
- The contractor’s written permit notice, which shows which permits the job needs and who will get them (step 9).
- At the end: DOB sign-off on every permit before the deposit is returned.
The board’s own step in DOB NOW. Since February 2, 2026, a board representative must confirm in DOB NOW that the board authorized a permit filing for a co-op or condo unit. According to DOB’s service notice:
- Sign in to DOB NOW: Build with an NYC.ID account.
- Open the job the applicant filed.
- On the Statements & Signatures tab, open “Condo/Co-Op Board Attestation”, check the box and save.
The filing needs this step, so decide in advance who on the board handles it and give them an NYC.ID account.
Licensed contractors in Riverdale and Kingsbridge
Every business in our directory shows its NYC license number, checked against city records in October 2026.
- General contractors in Riverdale
- Interior renovation contractors in Riverdale
- Licensed plumbers in Riverdale
- Licensed electricians in Riverdale
- All contractors by ZIP code
This checklist is general information, not legal advice. Your building’s alteration agreement and your managing agent have the final word on building rules; for city rules, check with DOB or call 311.